Opens
Verifying
Now closing!
Closed
()

334 - 3M RFF 4000 full face mask (2x)

Lisserbroek | NL
4 Bid Bids Highest bidder Outbid

My last bid: €0.00 (Auto bid)

Share:

Product information

Brand 3M
Amount 2
Type RFF 4000

Additional information

Pickup days are scheduled for September 18 and 19 from 09:00 to 16:00 and September 23, 24, 25 and 26 by appointment. Buyers will be contacted within 48 hours after the sale closure and will be appointed to 1 of those days (buyers will be spread over that period via a schedule for safety on site and crowd control). Contact details of the preferred and professional international service partner Auction Logistics B.V. (for pickup assistance, dismantling, loading and/or fully serviced lot transportation) will be shared with all buyers immediately after the sale.

Viewing days

: -

Kruisbaak 25
2165 AJ Lisserbroek (Netherlands)

Pick-up days

Pickup according to schedule -
: -

Kruisbaak 25
2165 AJ Lisserbroek (Netherlands)

Pickup according to schedule -
: -

Kruisbaak 25
2165 AJ Lisserbroek (Netherlands)

Pickup according to schedule -
: -

Kruisbaak 25
2165 AJ Lisserbroek (Netherlands)

Pickup according to schedule -
: -

Kruisbaak 25
2165 AJ Lisserbroek (Netherlands)

Pickup according to schedule -
: -

Kruisbaak 25
2165 AJ Lisserbroek (Netherlands)

Pickup according to schedule -
: -

Kruisbaak 25
2165 AJ Lisserbroek (Netherlands)

Relevant lots

  • Overview picture of Atlas Copco air filter (6x)
    0 Bid Bids Highest bidder Outbid

    109 - Atlas Copco air filter (6x)

    Alessandria (AL) | Italy

    Storage and Handling - Air Filtration and Treament

    €50.00

  • Overview picture of Ebac Industrial Products MK11 bouwdroger (2x)
    0 Bid Bids Highest bidder Outbid

    56 - Ebac Industrial Products MK11 bouwdroger (2x)

    Menen | Belgium

    Contractor materials - Various contractor materials

  • Overview picture of DF400AX bouwdroger
    0 Bid Bids Highest bidder Outbid

    66 - DF400AX bouwdroger

    Menen | Belgium

    Contractor materials - Various contractor materials